FRP

FRP Development Corp / Florida Rock Properties, Inc.

Portfolio

  • Riverfront On the Anacostia
  • Riverfront On the Anacostia
  • Riverfront On the Anacostia
  • Riverfront On the Anacostia

Riverfront On the Anacostia

Mixed Use Development totaling 1.1M square feet

FRP owns a 5.8 acre parcel under development in Washington D.C. that fronts the Anacostia River adjacent to the Washington Nationals Baseball Stadium.  The fully approved Planned Unit Development entitlements for the site permit the development of a four building, mixed use project, containing over 1Million square feet.  The development will include numerous publicly accessible open spaces and a waterfront esplanade along the Anacostia River.

Phase I:  “Dock 79 at RiverFront” commenced construction in October 2014 and consists of 300,000 square feet inclusive of 305 one and two bedroom apartments and 19,500 square feet of retail.  The project was placed in service in October of 2016 and we have a joint venture partner that owns 23% of the project. 

Phase II will consist of 300,000 square feet inclusive of approximately 275 one and two bedroom apartments and 10,000 square feet of retail.  Entitlements were completed in the first quarter of 2017.  Final design and permitting will take approximately 12 months with an anticipated construction commencement in the Spring of 2018.

General Information

  • Total Site: 5.8 acres approved for over 1M square feet of mixed use development
  • 900+ feet of frontage on the Anacostia River
  • Abundant open space
  • Fronts the Anacostia River and adjacent to the Washington Nationals Baseball Stadium

 

Copyright © 2017 FRP Development Corp / Florida Rock Properties, Inc. (FRP) All rights reserved Created by Mission

FRP Development Corp / Florida Rock Properties, Inc.

34 Loveton Circle, Suite 200 | Sparks, MD 21152
Phone: (410) 771-4100 Fax: (410) 771-8150
Building Emergency Contact Line: (410) 771-8143